St. Louis, MO – Air Masters has completed Phase I of the HVAC Modernization Project for the North County Technical High School for the Special School District of St. Louis County. This phase included 23 new makeup air and air handlers on the roof and five additional makeup air and air handlers inside dedicated to the culinary arts classroom and gymnasium.
The project included several unique challenges. The existing HVAC system was running at the same time the new main HVAC system was being constructed. In addition, each trade shop at the technical school required a specialized design. For example, the welding shop has 3 exhaust fans serving 26 welding booths for welding practice and the diesel shop has a muffler exhaust system built under the floor to exhaust diesel motor fumes indoors. Phase I was completed August 1, 2014. |
Source: IFS – News